Cost & Savings Breakdown
Based on $150/month electric bill in Bend
System Size
8.5 kW
Annual Production
11,870 kWh
Gross System Cost
$26,253
Federal Tax Credit (30%)
-$7,876
State Incentive
-$5,000
Net Cost
$13,377
Monthly Savings
$122
CO₂ Offset/yr
10,920 lbs
25-Year Savings Projection
Utility & Net Metering
Local UtilityPacific Power
Net Metering PolicyModified Net Metering
Compensation RateAvoided cost rate
Capacity LimitNo overall limit
Electricity Rate$0.123/kWh
Peak Sun Hours4.8 hrs/day
Available Incentives
30%
Federal ITC — Deduct 30% of your system cost from federal taxes. Available through 2032.
$5,000
Oregon State Incentive — Oregon offers a rebate of up to $5,000 through the Oregon Solar + Storage Rebate Program.
Common Questions
How much does solar cost in Bend?
Solar in Bend, Oregon costs approximately $26,253 for a 8.5 kW system. After the 30% federal tax credit, your net cost is about $13,377.
What is the solar payback period in Bend?
The estimated payback period for solar in Bend is 9.2 years, based on a $150/month electric bill and local sun hours of 4.8 hrs/day.
Does Pacific Power offer net metering?
Pacific Power offers Modified Net Metering net metering. Avoided cost rate.